TerraPower Natrium Reactor, Kemmerer Power Station Unit 1 — NRC Licensing Review Timeline

Docket 05000613 2023-04-25 – 2026-03-09 24 activities
3 ACRS Reviews 3 Audits 2 Correspondence 8 FSAR Chapters 3 Meetings 5 Topical Reports
How to use this page
Glossary
ACRS
Advisory Committee on Reactor Safeguards
CP
Construction Permit
DCA
Design Certification Application
ESP
Early Site Permit
FSAR
Final Safety Analysis Report
RAI
Request for Additional Information
SER
Safety Evaluation Report
TR
Topical Report
Type:
Period:
📱 Rotate your phone for a better view of the timeline
Topical Reports
Audits
ACRS Reviews
FSAR Chapters
Correspondence
Meetings

Activities

Name Type Start End Duration (days) RAI Req RAI Resp Accessions
An Analysis Of The Potential Volcanic Hazards At The Proposed Natrium Site Near Topical Report2023-04-252024-09-06500002
I&C Systems AuditAudit2024-06-242024-06-240001
Regulatory Audits 2024Audit2024-07-152024-11-18126005
Regulatory Audits 2025Audit2025-02-212025-11-25277005
Design Basis Accident Methodology for Events with Radiological Release,Topical Report2025-02-282025-02-280001
ACRS Review 2025-03Acrs Review2025-03-052025-03-050001
Replacement File for Approved TerraPower, LLC Fuel and Control Assembly QualifiTopical Report2025-03-242025-03-240001
Partial Flow Blockage Methodology,Topical Report2025-05-092025-05-090001
Reactor Seismic Isolation System Qualification Topical Report,Topical Report2025-07-102025-07-100001
ACRS Review 2025-10Acrs Review2025-10-082025-10-3022005
FSAR Chapter 13: Conduct of OperationsFsar Chapter2025-11-042025-11-040001
FSAR Chapter 1: Introduction and General DescriptionFsar Chapter2025-11-042025-11-040001
FSAR Chapter 4: ReactorFsar Chapter2025-11-042025-11-040001
FSAR Chapter 5: Reactor Coolant SystemFsar Chapter2025-11-042025-11-040001
ACRS Review 2025-11Acrs Review2025-11-042025-11-040003
FSAR Chapter 8: Electric PowerFsar Chapter2025-11-062025-11-060001
FSAR Chapter 7: Instrumentation and ControlsFsar Chapter2025-11-062025-11-060001
FSAR Chapter 6: Engineered Safety FeaturesFsar Chapter2025-11-062025-11-060001
FSAR Chapter 3: Design of Structures, ComponentsFsar Chapter2025-11-062025-11-060001
Applicant CorrespondenceCorrespondence2024-06-032025-10-03487005
NRC CorrespondenceCorrespondence2024-05-212026-03-09657005
ACRS MeetingsMeeting2025-10-082025-11-0528005
Public MeetingsMeeting2024-07-152025-08-21402005
Other MeetingsMeeting2024-07-232025-10-23457005